EasyManua.ls Logo

Epson C8-B - Page 311

Epson C8-B
455 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
C8-B/C12-B Service Manual Maintenance Disclosure Scope: Maintenance Trained Personnel Only
(C) Seiko Epson Corporation 2-269 Rev.1
13. Place the connectors inside the arm so that the cover can be installed.
Secure the Cable Unit to Arm2.
1. Secure the cable protective spring to Arm2 with the bracket (S3).
5
S01: 2-M4x8
(4.0 +/- 0.2 Nm)
A
Bracket (S3)
Cable protective spring
Arm2
Installing the Cable Unit

Table of Contents

Related product manuals