Maintenance and care
155
Installing the absorption felt
• Install a new absorption felt as shown in
the illustration. The felt should be halfway
in the sealer.
• Bend the upper part of the felt to the right
and push it beneath the letter receiving tray
until it reaches the stop in the contour.
• Evenly push the arched absorption felt with
your hand into the fluid reservoir. Make
sure that the felt is correctly seated, in
particular at the edges. The stop in the
positioning contour must fit precisely in the
opening of the letter receiving tray.
• As a final measure, stroke with your finger
over the felt repeatedly to eliminate any
irregularities.
Positioning
contour
Absorption felt
Letter receiving
tray