EasyManua.ls Logo

FP PostBase Fusion - Page 35

FP PostBase Fusion
209 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation and commissioning
35
Connection on the postage meter Connect the feeder connection cable to the
CAN-BUS interface of the postage meter.
Screw the connector on tightly.
Power connection Plug the power cable into the power con-
nection for the feeder.
Only then plug the power cable into the
power outlet.
Filling the sealant tank with sealing fluid
Warning! Electrical hazard due to short
circuits. Be extremely careful when handling
fluids. When filling the tank, make sure that
no live parts become wet. However, if this
does occur: Immediately disconnect the
power plug. Have the PostBase Fusion
mailing system checked by the Customer
Support before using it again.

Table of Contents

Related product manuals