14.8 Connection to data centre
On commissioning through the service, setting up the connection to the data centre
is part of the installation routine. You should check and – if need be – correct the set-
tings if changes were made to your equipment / system environment.
When in doubt, contact your network administrator.
Open the M
ENU.
Choose M
ANAGE CONNECTION.
PostBase One shows the current connectiv-
ity settings.
Changing the settings
Press CHANGE.
Simply follow the instructions on the
display. PostBase One successively
prompts you to specify all necessary
details.
When finished, PostBase One displays the
current connection configuration.
If everything is correct: S
AVE.
The chart on the following pages gives an
overview of the possible settings and param-
eters.