EasyManua.ls Logo

Gatewing X100UAS - 19.5.6 Seal the payload bay with the top cover; 19.6 Launch; 19.6.1 Assemble the launcher

Default Icon
210 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2.0 — 165 — 12 October 2012
Prepare for flight
Launch
19.5.6 Seal the payload bay with the top cover
P
REREQUISITES
● X100 body
● Top cover with plastic screw
● Flat-bladed screwdriver
1 Make sure no connectors or cables are hanging over the edge of the payload bay.
2 Place the top cover on the payload bay of the X100 body.
3 Using the flat-bladed screwdriver, secure the top cover with the plastic screw.
C
AUTION: Tighten it hand-tight, do not overstrain.
19.6 Launch
19.6.1 Assemble the launcher
P
REREQUISITES
● Launcher bag
● Launch area

Table of Contents