2.0 — 151 — 12 October 2012
Prepare for flight
Flight plan
● When establishing a wireless link between the GCS and the X100
● When arming the X100
● Continuously during flight
1 Monitor the MPBat field:
19.4 Flight plan
19.4.1 Create a project
P
REREQUISITES
● GCS with Quickfield software installed
● Internet connection when defining project location online
● GPS position
Creating a project is typically done in the office.
1 Open Quickfield and click New Project on the opening screen.
Time
Battery voltage
must be above
If not
When establishing a wireless
connection
12.0 V Replace the battery with a fully
charged one.
When arming the X100 12.0 V Handle a low battery warning
before launch
During flight 10.2 V Handle a low battery warning
(10.2 V) during flight
9.6 V Handle a low battery warning (9.6
V) during flight