EasyManua.ls Logo

Gatewing X100UAS - Page 169

Default Icon
210 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2.0 — 169 — 12 October 2012
Prepare for flight
Launch
7 Attach the launch cable to the launch dock with the lock pin.
C
AUTION: Make sure the launch cable is not tightened or twisted.
8 Insert the safety pin into the launch dock.

Table of Contents