EasyManua.ls Logo

GE Druck PM 620

GE Druck PM 620
84 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
[EN] English - K0449 Electrical and IDOS operations 3-1
Chapter 3: Electrical and IDOS
operations
3.1 Introduction
This section gives examples of how to connect and use the
instrument for these operations:
to measure and source electrical values
to measure the pressure with an IDOS module
Before you start:
Read and understand the “Safety” section.
Do not use a damaged instrument.
Note: Use only original parts supplied by the manufacturer.
3.2 Measure and
source operations
When you first use the calibrator, there are default
measure and source functions on the display; see
Section 2.10.3.
3.2.1 Procedure overview
To use the calibrator, complete these procedures:
Set the calibrator functions you want to use on the display:
item ; see Section 2.10.3. This includes:
a. CH1: Channel 1 electrical function (measure or source)
b. CH2: Channel 2 electrical function (measure or source)
c. Pressure function (P1 and/or P2): for the MC 620 module
carrier, see Chapter 4; for the PV 62x pressure stations
(P1 only), refer to user manual - K0457
d. IDOS function: to measure pressure with an IDOS
universal pressure module (UPM), see Section 3.3
e. other functions (maximum: 6 functions)
If necessary, change the Units for the function: item ;
see Section 2.10.5
If necessary, set a Utility for the function: item ; see
Section 2.10.6
a. Max/Min/Avg
b. Switch Test
c. Leak Test (pressure options only)
C
B
A
TAP
2
1
A
B
C

Table of Contents

Related product manuals