EasyManua.ls Logo

GE Druck PM 620

GE Druck PM 620
84 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Issue 1
4-4 Pressure indicator operation (MC 620) K0449 - [EN] English
When all the software selections are complete, make the
applicable pressure and electrical connections. Examples:
Measure pressure (Section 4.4.4)
4.4.2 Set up a Leak Test
1) Set the Utility
Set the Utility to Leak Test (Section 2.10.6).
2) Set the Leak Test
options
When you have set the Utility to Leak Test, you can set these
options:
Wait Time: The time before the test starts in
hours:minutes:seconds (hh:mm:ss)
Test Time: The period of the leak test in
hours:minutes:seconds (hh:mm:ss)
Note: To set the Leak Test options, you must have a pressure
module correctly installed (Section 4.2.1).
2
1
3
4
Select Leak Test Select Test Time
Steps 5 and 6: Set the Test Time
+ Set the Wait Time (if necessary)
TAP the window
(Maximise)
Select Settings
5
6
7
Start the test and let it
complete.
Go back to the Home window. Start the test
when the pressure system is set up.
Stop the test (with no results)

Table of Contents

Related product manuals