EasyManua.ls Logo

GE Druck PM 620

GE Druck PM 620
84 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Issue 1
3-2 Electrical and IDOS operations K0449 - [EN] English
If necessary, change the Process for the CH1 and/or CH2
measure functions: item
This includes: Tare, Alarm, Filter, Flow, Scaling; see
Section 2.11.1.
There are more optional Settings for the TC, Frequency, and
RTD functions.
If necessary, change the Automation options for the CH1
and/or CH2 source functions: item
This includes: Nudge, Span Check, Percent Step,
Defined Step, Ramp; see Section 2.11.2
There are more optional Source Settings for the TC,
Frequency, and RTD functions.
There are other Settings for Observed functions; see
Section 2.11.3.
When all the software selections are complete, make the
applicable electrical connections.
3.2.2 Example procedure: Measure or source current
These examples (A and B) show Channel 1 (CH1) set up to
measure or source a current with external loop power.
Note: If you use the Channel 2 (CH2) connectors, you can use
Channel 2 to measure or source these ranges with internal or
external loop power (internal loop power = 24 V).
1
D
TAP
D
1
E
TAP
E
2
Maximum: 30V
Source current on
channel 1 (CH1)
Range: 0 to 24 mA
Automation: Nudge
(Section 2.11.2)
2
Maximum: 30V
1
B
3
Measure current on
channel 1 (CH1)
Range: ±55 mA
A
1

Table of Contents

Related product manuals