Issue 1
3-12 Electrical and IDOS operations K0449 - [EN] English
c. Leak Test. The procedure is the same for an IDOS
module or for a MC 620/PM 620 assembly; see
Section 4.4.2.
If necessary, change the Settings for the IDOS function:
item
a. Process (Tare, Alarm, Filter, Flow, Scaling);
see Section 2.11.1
b. Leak Test (Only when the Utility is set). The procedure is
the same for an IDOS module or for a MC 620/PM 620
assembly; see Section 4.4.2
c. Zero. The procedure is the same for an IDOS module or
for a PM 620 module; see Section 4.4.3. We recommend
that you zero a gauge sensor before you use it.
Continue with the pressure operation.
3.3.3 Example procedure: Measure pressure with an IDOS module
1. Assemble the DPI 620 calibrator and the IDOS module; see
Section 3.3.1.
2. To attach the external pressure equipment, refer to the user
manual for the Druck IDOS UPM - K0378.
3. Set the applicable software options; see Section 3.3.2
(IDOS function procedures). This example shows the
calibrator set up with the IDOS function only.
1