EasyManua.ls Logo

GEDA 200Z - Page 22

GEDA 200Z
100 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Rack and pinion hoist
Assembly and Operating Instructions
22 / 100 BL108 GB Edition 03.2018 Rev. 02
3 = Spring-loaded cable drum
11 = Drive motor
12 = Switch box, foot section
13 = Socket (grey) for manual
control
14 = Manual control
(ground control)
Assembly protection bar
A protection bar (15) which
immediately stops the platform
travelling in either direction when
operated is mounted on the upper
side of the trolley to protect persons
during installation and maintenance
work.
Wheels
Wheels (16) for transporting the
base unit.
Tilt the base unit until it can be
wheeled away standing on its
wheels.
3
12
11
13
14
15
16

Table of Contents