EasyManua.ls Logo

GEDA 200Z - Emergency Shutdown; Interrupting Work - End of Work

GEDA 200Z
100 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Rack and pinion hoist
Assembly and Operating Instructions
60 / 100 BL108 GB Edition 03.2018 Rev. 02
6.5 Emergency shutdown
In situations that present a risk to operating personnel or the hoist, the
load platform can be shutdown by pressing the EMERGENCY STOP
button.
There is an EMERGENCY STOP button on the manual control
(ground control).
EMERGENCY STOP buttons are
equipped with a latching
mechanism and remain active until
they are manually released (turn
the red EMERGENCY STOP slam
button to the right and pull out).
6.6 Interrupting work end of work
Move the load platform down to the lowest position with the DOWN
(manual control) and unload.
Unplug manual control and keep safe.
Turn the main switch to 0and secure with
a padlock.
Disconnect the mains plug.

Table of Contents