EasyManua.ls Logo

GEDA 200Z - Rescue Action Plan

GEDA 200Z
100 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Rack and pinion hoist
Assembly and Operating Instructions
87 / 100 BL108 GB Edition 03.2018 Rev. 02
9.2.2 Rescue action plan
Action 1: Checking the EMERGENCY STOP button.
This could have been accidentally actuated.
Unlock the EMERGENCY STOP button (1)
(refer to Chapter 6.5)
Press BUTTON UP (2) or DOWN (3) to
continue travel.
Load platform begins to move.
Action 2: Checking the manual control (ground control).
Repair / replace the control
Press BUTTON UP (2) or DOWN (3) to continue travel.
Load platform begins to move.
Action 3: EMERGENCY descend
During EMERGENCY descent, when releasing the motor brake the load
platform descends to the ground station.
Release the motor brake using a pull-
cord (4) from the ground (outside the
danger zone) by pulling in measured
amounts on the brake release lever (5).
Load platform glides down.
Avoid overheating of the brake. Interrupt the lowering process for
2 minutes at the latest after every 1-2 meters. The length of a mast
section can be used for orientation.
5
4
1
2
3

Table of Contents