5.6 Check after assembly and before each operation
Check to ensure that
the ladder track is vertical.
the gear racks are adequately greased.
all the rail brackets required have been carefully mounted on the
ladder track and the associated fastening tubes carefully mounted on
the brickwork or scaffolding.
all interlock levers of the ladder sections (excluding the top one) are
closed (are positioned vertically downwards).
the specified maintenance work and inspection procedures have
been carried out.
there is no oil leaking on the gear motor.
the supply cable has an adequate cross section.
the direction of rotation of the motor agrees with the UP and DOWN
buttons and the EMERGENCY STOP buttons interrupt travel.
the top interlocking lever or limit switch approach bar interrupts the
ascent.
the length of cable of the spring-loaded cable reel is sufficient for the
assembly height.
Excluding the access, the danger area to the load carrying device at
the lower loading point is cordoned off.
Information plates are present and legible (see Appendix A)
Carry out a function check of the manual control (ground control).
There must be no sign of damage to the trailing cable, mains supply
line and control lines.
Carry out a drop test to check the function of the safety gear.
(Refer to Chapter 8.5.2).
Check the GEDA 200 Z according to national regulations after
assembly and before initial commissioning, as well as after each
assembly at a new construction site or any other new site.