EasyManua.ls Logo

Getinge Maquet FLOW-i 4.2

Getinge Maquet FLOW-i 4.2
317 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4.3 Leakage check
Performs a Leakage check of the manual and
automatic breathing circuits. It shall be
performed after each change of tubings,
breathing bags or filters.
01-01 13 00
2 4
1 3
Leakage check preparatory phase contains
four steps, equivalent to steps 1, 2, 3 and 6
performed during the Full system check, see
section 4.2.1.
The automatic check sequence includes
automatic and manual breathing circuit
leakage checks.
01-01 13 00
1 2 3
A summary of the results is displayed after the
automatic check. Press the Standby touch
pad to enter Standby mode or press any of
the touch pads marked 1-3 to repeat any of
the checks.
The circuit compliance compensation is
re-calculated during the Leakage check and
the log is updated with the new measured
values for leakage.
FLOW-i 4.2, User's Manual
59
| Startup and system checkout |
4 |

Table of Contents

Related product manuals