EasyManuals Logo

Getinge Maquet PowerLED II User Manual

Getinge Maquet PowerLED II
116 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #57 background imageLoading...
Page #57 background image
Use
Controlling the light
4
Maquet PowerLED II
IFU 01811 EN 10
57 / 116
4.2.6 Synchronising the lightheads
4.2.6.1 From the wall-mounted control keypad
1
Fig.58: Synchronising the lightheads via the wall-mounted keypad
Synchronising the lightheads
1. Adjust one of the lightheads to the desired settings.
2. Press the button 1 for the lighthead to be synchronised and hold it until the button is backlit.
Repeat this step to synchronise a third lighthead.
Ø The lightheads are now synchronised and all changes on one lighthead will result in the
same changes being applied to the other lighthead(s).
Desynchronising the lightheads
1. To desynchronise the desired lighthead(s), press the button 1 for the lighthead to be desyn-
chronised and hold it until the button is no longer backlit, or modify the status of a lighthead
using its local control keypad.
Ø The lightheads are no longer synchronised.
NOTE
Special case: To synchronise lightheads with ambient light mode, this mode must
be active on the lightheads concerned before synchronisation.

Table of Contents

Other manuals for Getinge Maquet PowerLED II

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Getinge Maquet PowerLED II and is the answer not in the manual?

Getinge Maquet PowerLED II Specifications

General IconGeneral
BrandGetinge
ModelMaquet PowerLED II
CategoryMedical Equipment
LanguageEnglish

Related product manuals