EasyManua.ls Logo

Haefely AXOS - Manually Setting Sequence Results

Haefely AXOS
96 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Sequence
73
Figure 13-8: Sequence finished
13.2.3 Manually set & Complete sequence result
Sequence button access the result dialog. There it is possibility to change the final result
of the unit (Passed or Failed).
EUT immunity pass/fail criteria can be selected in Figure 12-9 as well.
Figure 13-9: Figure 12-9 Sequence result
Criteria is saves when returining to sequence or after Axos is turned off.
13.2.4 Clearing of result
Sequence button for clearing the test results column.

Table of Contents