Figure 16-3: EFT Verification Kit
16.3.4 Burst verification adapter
Additionally, an EFT verification adapter is available for testing of every single phase (L, N, PE
front view from AXOS). It gets connected with the PE pin (Pos. 12 Figure 5-1) and every single
phase (L, N, PE Figure 5-1).The BNC output of the burst adapter is then connected to the
oscilloscope. Do not connect “EUT Supply Input” to power supply, when verification of burst
output.
Figure 16-4: Burst verification adapter