The installation is complete.
Riser and riser cage options
Installing primary and secondary risers
Prerequisites
Before you perform this procedure, make sure that you have the following items available:
• The components included with the hardware option kit
• T-10 Torx screwdriver
Procedure
1. Power down the server.
2. Do one of the following:
• Disconnect each power cord from the power source.
• Disconnect each power cord from the server.
3.
Do one of the following:
• Extend the server from the rack.
• Remove the server from the rack.
4.
Remove the access panel.
5.
Remove the riser cage.
6.
Remove the riser board.
7. Install the riser.
100
Hardware options installation