Installing a rear 2 SFF SAS/SATA drive cage in the primary or secondary riser
Prerequisites
Before you perform this procedure, make sure that you have the following items available:
• T-10 Torx screwdriver
• The components included with the hardware option kit
• The front drive bays are fully populated with 12 LFF or 24 SFF drives.
• High-performance fans are installed in all fan bays.
Procedure
1. Power down the server.
2. Remove all power:
a. Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Do one of the following:
•
Extend the server from the rack.
•
Remove the server from the rack.
4.
Remove the access panel.
5.
Do one of the following:
• For primary bays, remove the riser cage.
Hardware options installation