Installing an energy pack
Prerequisites
Before you perform this procedure, make sure that you have the following items available:
• T-10 Torx screwdriver
• The components included with the hardware option kit
• Storage controller backup power cable (ships with the storage controller)
• Make sure that a Smart Array P-class Gen10 controller is installed.
• If you are installing the HPE Smart Storage Hybrid Capacitor,
verify that the system BIOS meets the minimum
firmware requirements.
Procedure
1. Power down the server.
2. Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Do one of the following:
•
Extend the server from the rack.
• Remove the server from the rack.
4.
Remove the access panel.
5.
Do one of the following:
•
Remove the air bale.
• If installed, remove the 4LFF midplane drive cage.
6.
Remove the fan cage.
7.
Install the energy pack.
98
Hardware options installation