9. Connect the power and data cables.
10.
Install the fan cage.
11.
Install the access panel.
12.
Slide the server into the rack.
13.
Connect each power cord to the server.
14.
Connect each power cord to the power source.
15.
Power up the server.
The installation is complete.
Installing a front 2 SFF NVMe/SAS/SATA Premium drive cage
Prerequisites
Before you perform this procedure, make sure that you have the following items available:
T-10 Torx screwdriver
The components included with the hardware option kit
This installation requires a universal media bay.
Procedure
1. Power down the server.
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Do one of the following:
68
Hardware options installation