For more information, see the documentation that ships with the power supply.
Installing a Universal Media Bay
Prerequisites
Before you perform this procedure, make sure that you have the following items available:
• The components included with the hardware option kit
• T-10 Torx screwdriver
Procedure
1.
Power down the server.
2. Remove all power:
a. Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Do one of the following:
•
Extend the server from the rack.
• Remove the server from the rack.
4.
Remove the access panel.
5.
Remove the air bale.
6.
Remove the fan cage.
7.
Remove the bay blank.
8. Route the USB and video cables through the opening.
9. If installing a two-bay SFF front drive cage, install the drive cage.
60
Hardware options installation