5. Remove the air bale.
6. Remove the fan cage.
7. Remove the bay blank.
8.
Install the 8 SFF front drive cage option.
9. Connect the power and data cables.
10. Install the fan cage.
11.
Install the air bale.
12. Install the access panel.
13. Slide the server into the rack.
14. Connect each power cord to the server.
15. Connect each power cord to the power source.
16.
Power up the server.
66
Hardware options installation