• The front bays are fully populated with 12 LFF or 24 SFF drives
• High-performance fans are installed in all fan bays
Procedure
1. Power down the server.
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Do one of the following:
•
Extend the server from the rack.
• Remove the server from the rack.
4. Remove the access panel.
5.
Do one of the following:
• If installed, remove the secondary riser cage.
• Remove the secondary wall blank.
78
Hardware options installation