Step 1 Adjust the base height.
1. Measure the distance (H) between the concrete oor and the upper surface
of the ESD oor using a ruler and record the value of H.
Figure 3-6 Measuring the oor height
2. Adjust the base height to H and tighten the height locking bolts on the feet.
Figure 3-7 Tightening height locking bolts
Step 2 Assemble the base.
1. Adjust the base depth based on the cabinet depth.