• Raise the lift mast (15) and load it.
• Set down the lift mast (15) safely:
• Place the mast (15) carefully on two identical pallets (83).
• Secure the lift mast (15) with the lashing straps (82) tightly on the pallets (83).
• Tighten the lashing straps (82) with their tensioners.
Loading the lift mast by crane is now complete.
57
04.19 en-GB