EasyManua.ls Logo

Juniper EX2300-C - Chapter 10 Planning the Virtual Chassis; Planning EX2300 Virtual Chassis

Juniper EX2300-C
294 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHAPTER 10
Planning the Virtual Chassis
Planning EX2300 Virtual Chassis on page 119
Understanding EX2300 Virtual Chassis Hardware Configuration on page 120
Planning EX2300 Virtual Chassis
Before interconnecting EX2300 switches in a Virtual Chassis configuration, you must
consider the following factors:
The number of switches in the Virtual Chassis and their location—You can interconnect
a maximum of four EX2300 switches to form a Virtual Chassis composed exclusively
of EX2300 switches.
Mounting—You can mount the switches in a single rack or install them on multiple
racks. For information about the size and strength of racks, see “Rack Requirements”
on page 59.
Cabling requirements for Virtual Chassis—You can interconnect EX2300 switches into
a Virtual Chassis by using the uplink ports configured as Virtual Chassis ports (VCPs).
For information about uplink port cabling requirements, see “Management Cable
Specifications” on page 105.
Power requirements—You must plan the installation site to meet the power
requirements of the switches in a Virtual Chassis. See “Power Specifications for EX2300
Switches” on page 67.
License requirements—You must havelicense keysfor all the devices. See Understanding
Software Licenses for EX Series Switches.
Related
Documentation
Understanding EX Series Virtual Chassis Components
Understanding EX2300 Virtual Chassis Hardware Configuration on page 120
Clearance Requirements for Airflow and Hardware Maintenance for EX2300 Switches
on page 61
119Copyright © 2017, Juniper Networks, Inc.

Table of Contents

Other manuals for Juniper EX2300-C

Related product manuals