Table 29: Site Preparation Checklist (continued)
DatePerformed byFor More InformationItem or Task
Hardware Configuration
“EX2300 Switches Hardware
Overview” on page 3
Choose the number and types of switches you
want to install.
Rack or Cabinet
“Rack Requirements” on page 59
“Cabinet Requirements” on page 60
Verify that your rack or cabinet meets the
minimum requirements for the installation of
the switch.
“Clearance Requirements for Airflow
and Hardware Maintenance for
EX2300 Switches” on page 61
Plan rack or cabinet location, including required
space clearances.
Secure the rack or cabinet to the floor and
building structure.
Desk or Wall
“Requirements for Mounting an
EX2300 Switch On or Under a Desk
or Other Level Surface or On a Wall”
on page 60
Verify that the wall meets the minimum
requirements for the installation of the switch.
“Clearance Requirements for Airflow
and Hardware Maintenance for
EX2300 Switches” on page 61
Verify that there is appropriate clearance in your
selected location.
Cables
Acquire cables and connectors:
•
Determine the number of cables needed
based on your planned configuration.
•
Review the maximum distance allowed for
each cable. Choose the length of cable based
on the distance between the hardware
components being connected.
Plan the cable routing and management.
Related
Documentation
General Safety Guidelines and Warnings on page 223•
• General Site Guidelines on page 57
• Installing and Connecting an EX2300 Switch on page 127
• Mounting an EX2300 Switch on page 128