NOTE: The SRX210 Services Gateway cannot be center-mounted in racks.
Table 28 on page 66 provides the list of tasks you need to perform before installing the
device.
Table 28: SRX210 Services Gateway Preinstallation Checklist for
Rack-Mount Installation
Additional InformationTask
“Site Preparation Checklist for the SRX210
Services Gateway” on page 49
Verify that the site meets the requirements.
“SRX210 Services Gateway Rack
Requirements” on page 52
Verify that the racks or cabinets meet the specific
requirements.
“Clearance Requirements for Airflow and
Hardware Maintenance of the SRX210
Services Gateway” on page 53
Place the rack or cabinet in its permanent location,
allowing adequate clearance for airflow and
maintenance, and secure it to the building structure.
“Unpacking the SRX210 Services Gateway”
on page 61
Remove the services gateway chassis from the
shipping carton.
Verify that you have the following parts available
in your rack-mounting kit for the SRX210 Services
Gateway:
•
Rack-mounting brackets
•
Mounting screws
•
Power supply adapter tray with screws
•
Adapter stopper bracket
“Adjusting the Power Supply Adapter Tray
for the SRX210 Services Gateway for
Rack-Mount Installation” on page 70
Adjust the power supply adapter tray.
NOTE: The rack-mounting kit is not shipped with the device and must be
ordered separately.
Related
Documentation
Site Preparation Checklist for the SRX210 Services Gateway on page 49•
• Clearance Requirements for Airflow and Hardware Maintenance of the SRX210 Services
Gateway on page 53
• Unpacking the SRX210 Services Gateway on page 61
• Preparing the SRX210 Services Gateway for Rack-Mount, Desk-Mount, and Wall-Mount
Installation on page 65
• Preparing the SRX210 Services Gateway for Desk-Mount Installation on page 67
Copyright © 2010, Juniper Networks, Inc.66
SRX210 Services Gateway Hardware Guide