EasyManua.ls Logo

KCM 70Z7 - Page 301

Default Icon
383 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MAINTENANCE
7-60
Refueling
1. Park the machine following the same procedures as
described on page 7-7 for preparation of inspection/
maintenance work.
IMPORTANT: The turbocharger may be damaged if the
engine is not properly shut down.
WARNING: Handle fuel carefully. Shut the engine off
before fueling. Do not smoke while you fill the fuel
tank or work on fuel system.
2. Check fuel gauge (1) on the monitor panel. Add fuel if
necessary.
IMPORTANT: Keep all dirt, dust, water and other foreign
materials out of the fuel system.
3. To avoid condensation, fill the tank at the end of
each day’s operation. Take care not to spill fuel on the
machine or ground.
Fuel tank capacity: 235 liters (62 gallons)
4. Install and lock fill cap (2) immediately after fueling.
1
2
MNEC-01-002
MNDB-01-026

Table of Contents