EasyManua.ls Logo

Kuka KR 6-2 - Page 130

Kuka KR 6-2
206 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operating Instructions
130 of 206
BA KR 6, 16 F, KR C4 12.10.07 en
Explanation of symbols:
1
Maintenance point
Maintenance point, visible on drawing
Maintenance point, hidden on drawing
1.0 l
Oil change, to be repeated at specific intervals;
with indication of oil capacity
T ighten screw (nut)
Check and replace toothed belts
Visual inspection
The description of maintenance operations is subdivided into job steps with numbers in
brackets appearing before them. The text which immediately follows these steps must also
be read if it is specially marked by a warning triangle or either of the hand symbols. Many
of these marked texts refer to the preceding job step
.
Example:
(1) Pour specified amount of oil into filler hole (10).
Notice!
Only KUKA--approved lubricants may be used.
Some of the specially marked texts refer exclusively to the subsequent steps
-- until the in-
struction is expressly revoked or the work is completed at the end of a section.
Example:
Warning!
Turn the main switch on the robot control cabinet to “OFF” and secure it with a
padlock to prevent unauthorized persons from switching it on again.

Table of Contents

Related product manuals