First startup
ProtoMat S64/S104
62/160
5 First startup
This chapter contains important information on first startup of the system.
5.1 Safety
Observe the following safety instructions for the first startup of the system:
WARNING
Accident hazard due to insufficiently qualified personnel!
Insufficiently qualified personnel cannot assess the risks of using the system and
put themselves and others in danger.
Allow only qualified personnel to use the system.
Keep insufficiently qualified personnel out of the working area.
CAUTION
Tripping hazard by hoses and cables!
Hoses and cables are routed to the system. If the hoses and cables are laid
inappropriately they pose a tripping hazard for the operating personnel.
Always ensure that the hoses and cables do not pose a tripping hazard.
NOTICE
Property damage by moisture during transport/storage!
When transporting or storing the system, moisture can cause damage to the
system.
Ensure that there is no moisture in the system.
Before first startup of the system wait approx. 24 hours to allow the system to
acclimatize.