Operating the system
ProtoMat S64/S104
80/160
Restarting the system after an emergency
1. Switch off the system (On/Off switch in position 0).
2. Close the system software.
3. Reconnect the mains cable:
at the rear of the system.
at the wall socket.
4. Switch on the system (On/Off switch in position I) and start the system system
software.
The connection is established automatically and the system moves to its reference
points.
The system has been restarted after an emergency.
6.2 Preparations for use
Before working with the system check the following settings and conditions:
The requirements for the installation location (see page 63) have to be met.
If a cold system is brought into a warm environment, this can cause condensation of
humidity. Thus, the system that has been disconnected from the power supply should
acclimatize for 24 hours before you connect it to the power supply again.
Perform a visual check.
The following components have to be connected to the system and have to be
ready for operation:
PC (provided by customer)
Extraction system
Power supply
Operate the system on an over-current protection (240 V / 16 A / 100 V).