Before unpacking the system, ensure that the site meets the requirements
described in the following sections.
Space should be allocated with adequate ventilation and free air flow. The
working area for the system should be prepared according to the
dimensions shown in Figure 4-1. In order to guarantee proper ventilation,
always keep the sides of the system at least 0.5 m (20") from the wall or
from other obstructions to air flow.
Figure 4-1: Physical Dimensions
The system is equipped with a universal power supply module.
Accordingly, the system will require a separate line supply of:
● 100-240 VAC, 6A, 50/60 Hz, single phase
Input power lines should be free of transients, voltage and current spikes,
sags and surges. Consequently, the system power line should not be shared
with other heavy variable loads such as elevators, air conditioning systems,
large motors, etc.
It is strongly recommended that the system be connected to a separate
power line with separate circuit breakers. Lumenis cannot guarantee
adequate performance unless the system is connected to a dedicated
circuit.
Height 13.7 cm (5.4”)
Width 29.5 cm (11.6”)
Depth 26.3 cm
(10.4”)