1-13
RT9150E OPERATOR MANUAL INTRODUCTION
Published 2-23-2017, Control # 644-00
train the rope and help assure smooth operation during
its useful life.
Ideally, you should run these loads with reeving that lets
you place the loads on the block with all rope off the
drum except the last three wraps. If this is not possible,
alternate methods must be used to assure proper
tensioning of the rope on the drum.
Reference Only