RT9150E OPERATOR MANUAL SET-UP AND INSTALLATION
4
Grove
Published 2-23-2017, Control # 644-00
1. Remove the plug (2) from the socket (1) and plug it into
the dummy socket (4) (Figure 4-45).
2. Wind the cable (3) onto the storage lugs (6).
3. Remove the bridging plug (5) from the dummy socket (4)
and plug it into the socket (1).
Connecting the Anti-Two Block Switch
36 ft (11 m) Extension A2B Installation
To electrically connect the A2B switch the electrical
connections to this extension must be completed, refer to 36
ft (11m) Extension Electrical Connections, page 4-32.
1. Install the A2B switch assembly (5) (Figure 4-46) on to
the pin (4) and secure it with a retaining clip.
2. Remove the bridging plug (3) from the socket (1) and
plug it into the storage socket (2), as shown.
3. Route the cable (6) so that it will not be damaged during
crane operation, and connect the A2B connector (7) to
the socket (1).
36 ft (11 m) Extension A2B Removal
When the extension is no longer needed or if installing the 23
ft extension for 59 ft extension operation, the A2B switch
must be removed.
1. Remove the A2B connector (7) from the socket (1).
2. Connect the bridging plug (3) into the socket (1).
3. Install the cap on the storage socket (2).
4. Remove the retaining clip from the mounting pin and
remove the A2B assembly.
The A2B switch can now be moved to another location and
connected.
59 ft (18 m) Extension A2B Installation
To electrically connect the A2B switch the electrical
connections to this extension must be completed, refer to 59
ft (18 m) Extension Electrical Connections, page 4-32.
1. Install the A2B switch (3) on to the pin (2) and secure it
with a retaining clip (Figure 4-47).
2. Route the A2B cable (4) such that it will not be damaged
during crane operation, and connect the A2B switch to
socket (1).
59 ft (18 m) Extension A2B Removal
1. Remove the plug from the socket (1) (Figure 4-48).
2. Remove the A2B switch assembly (3) from the pin (2).
3. Fasten the retaining pin to the lifting limit switch.
7567-18
FIGURE 4-46
1
2
3
4
5
6
6
7
7567-19a
FIGURE 4-47
1
2
3
4
4
7567-19b
FIGURE 4-48
1
2
3
Reference Only

Table of Contents

Other manuals for Manitowoc Grove RT9150E

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove RT9150E and is the answer not in the manual?

Manitowoc Grove RT9150E Specifications

General IconGeneral
BrandManitowoc
ModelGrove RT9150E
CategoryConstruction Equipment
LanguageEnglish

Related product manuals