SAFETY INFORMATION RT9150E OPERATOR MANUAL
2-36 Published 2-23-2017, Control # 644-00
Be sure everyone is clear of the crane and work area before
making any lifts.
Never swing over personnel, regardless of whether load is
suspended from or attached to the boom.
Hand Signals
A single qualified signal person shall be used at all times
when:
Working in the vicinity of power lines.
The crane operator cannot clearly see the load at all
times.
Moving the crane in an area or direction in which the
operator cannot clearly see the path of travel.
At all times use standardized hand signals - previously
agreed upon and completely understood by the operator and
signal person.
If communication with the signal person is lost, crane
movement must be stopped until communications are
restored.
Keep your attention focused on the crane’s operation. If for
some reason you must look in another direction, stop all
crane movement first.
Obey a signal to stop from anyone.
Reference Only

Table of Contents

Other manuals for Manitowoc Grove RT9150E

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove RT9150E and is the answer not in the manual?

Manitowoc Grove RT9150E Specifications

General IconGeneral
BrandManitowoc
ModelGrove RT9150E
CategoryConstruction Equipment
LanguageEnglish

Related product manuals