EasyManua.ls Logo

Multitel MX 250 - Page 186

Multitel MX 250
186 pages
Print Icon
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DESCRIPTION
R NR RP
CHECK THE PRESSURE OF THE OUTRIGGERS CONTROL SYSTEM Checked □
CHECK THE OPERATION OF THE OUTRIGGERS DISTRIBUTOR Checked □
CHECK THE OPERATION OF THE INCLINOMETER (if installed) Checked □
COUNTER-FRAME STAY RODS TORQUE CHECK Done □
CHECK THE STATE OF THE OUTRIGGERS LIMIT SWITCHES Checked □
CHECK THE TORQUE OF THE FLANGING SCREWS OF THE JACK
VALVES
Checked □
CHECK THE FILTER ON THE OIL DELIVERY LINE Done □
CHECK THE PRESSURE OF THE DISTRIBUTOR ON THE TURRET Checked □
CHECK THE SEAL OF THE VALVES ON THE BOOM JACKS Checked □
CHECK THE TORQUE OF THE FLANGING SCREWS OF THE VALVES Checked □
CHECK THE PINS BETWEEN THE BOOMS Done □
CHECK THE PRESSURE OF THE BASKET DISTRIBUTOR Checked □
CHECK FOR PROPER OPERATION OF THE INCLINOMETER (if
installed)
Done □
CHECK THE SEAL OF THE BASKET LEVELLING CHECK Checked □
CHECK THE SAFETY BELT CONNECTIONS Checked □
BASKET CLAMPING BOLTS TORQUE Checked □
CONDITIONS OF TURRET WELDING Checked □
CONDITIONS OF TELESCOPIC BOOM WELDING Checked □
CONDITIONS OF THE TRAPEZIUM WELDING Checked □
CONDITIONS OF THE JIB WELDING Checked □
CONDITIONS OF BASKET SUPPORT WELDING Checked □
CONDITIONS OF THE BASKET WELDING Checked □
CHECKING THE TORQUE OF THE SLEWING PIN BOLTS Done □
CHECK THAT THE PINS DO NOT HAVE TOO MUCH PLAY IN THE
JOINTS AND THAT THEY ARE PROPERLY GREASED
Checked □
CHECK THE PLAY OF THE SLEWING PIN AND OF ITS OPERATING
SYSTEM
Checked □
MAKE SURE THERE ARE NO AREAS CORRODED BY RUST Checked □
MAKE SURE THAT THE ELECTRICAL BOXES ARE INTACT Checked □
CHECK THE INSULATION (if installed) Checked □
CHECK THAT THE STRUCTURE DOES NOT SHOW SIGNS OR
DEFORMATIONS DUE TO COLLITIONS, OVERLOADS OR WEAR
Done □
R=REGULAR
NR=NOT REGULAR
RP=REPAIRED
BOOM
BASKET
GENERAL CHECKS
CHECKS LOGBOOK
EXECUTION DATE
YEARLY CHECK
OUTCOME
OUTRIGGERS

Table of Contents