EasyManua.ls Logo

NEC Express5800 Series - Page 235

NEC Express5800 Series
358 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing and Using Utilities 5-51
but the link cable of a teamed LAN is connected to only one side of the modules or when a
storage device connected by FC is connected to only one side of the modules.
Procedure in NEC ESMPRO Manager
Start
1. Select the target component in the [ft] tree.
2. Check the current state with the "State" display on the target component screen.
3. Click the [Bring Up] button in the [Maintenance] screen for the target component.
A certain time is required for the start.
The start result can be confirmed by "State" on the target component screen. The result of
the start operation is reported by the server as an alert.
CHECK:
When starting a stopped IO module, diagnostics of the CPU/IO modules are
automatically performed. The IO module is started after the diagnostics.
Stop
Perform the procedure below before replacing a component.
1. Select the target component in the [ft] tree.
2. Check the current state with the "State" display on the target component screen.
3. Click the [Bring Down] button in the [Maintenance] screen for the target component.
A certain time is required for the stop.
The stop result can be confirmed by "State" on the target component screen. The result of
the stop operation is reported by the server as an alert.
CHECK:
When stopping IO module, check that the status of Ethernet is “Duplex” on NEC
ESMPRO Manager. Do not stop the IO module especially when LAN is connected
only to the IO module on that side.

Table of Contents

Other manuals for NEC Express5800 Series

Related product manuals