EasyManuals Logo

Oracle X5-2 User Manual

Oracle X5-2
180 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #66 background imageLoading...
Page #66 background image
Install the Cable Management Arm
Note - The slide-rail latching bracket has a green release tab. This tab is used to release and
remove the latching bracket so that you can remove connector D.
12.
Gently tug on the four CMA connection points to ensure that the CMA
connectors are fully seated before you allow the CMA to hang by its own weight.
13.
To verify that the slide-rails and the CMA are operating properly before routing
cables through the CMA:
a.
Extend all rack anti-tilt devices to prevent the rack from tipping forward
when the server is extended.
Caution - To reduce the risk of personal injury, stabilize the expansion rack cabinet and extend
all anti-tilt devices before extending the server from the rack.
For instructions for stabilizing the rack, see “Stabilize the Rack for
Installation” on page 43.
b.
Slowly pull the server out of the rack until the slide-rails reach their stops.
c.
Inspect the attached cables for any binding or kinks.
66 Oracle Server X5-2 Installation Guide • January 2021

Table of Contents

Other manuals for Oracle X5-2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Oracle X5-2 and is the answer not in the manual?

Oracle X5-2 Specifications

General IconGeneral
Number of Processors2
Cores per ProcessorUp to 18
Form Factor2U Rackmount
ProcessorIntel Xeon E5-2600 v3
MemoryUp to 768 GB DDR4
Power Supply1200W
Operating SystemOracle Linux, Oracle Solaris
Network4 x 10Gb Ethernet ports

Related product manuals