Use PPE!
Moving the primary formwork
1. Dismantle opposing guardrails.
2. Mount lifting hook on the panel and
attach to the crane lifting gear.
3. Release panel connection.
4. Remove anchor bolts of the
Push-Pull Props.
5. Release panel from the concrete,
e.g. with the stripping bar.g.
(Fig. A2.07)
6. Carefully lay the panel down and
clean.
7. Move panel to place of operation
by crane.
8. Connect panel with the Alignment
Coupler BFD, see Section A4.
9. Secure Push-Pull Props,
see Section A6.
10. Release crane lifting gear.
Closing the formwork
1. Move panel of the closing formwork
to the place of operations by crane.
2. Connect panels.
3. Install Tie System DW 15/20.
4. Release crane lifting gear.
5. Mount the working and concreting
platform. (Fig. A2.08)
Cleaning
With PERI Bio Clean and PERI
spraying equipment.
Follow Instructions for Use.
Fig. A2.07
A2 Standard operating sequence
Fig. A2.08
TRIO Panel Formwork
Instructions for Assembly and Use – Standard Configuration
AuV TRIO EX.indb 18 11.10.17 09:45

Table of Contents

Related product manuals