EasyManua.ls Logo

Powerscreen XA750S - Starting to Crush Material

Default Icon
292 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
20-2
21
Crusher Operation
Before Starting Plant
1. Ensure the full length of both tracks are in
contact with a 󰘰rm and level surface.
2. Check that the crushing chamber and feed
hopper are empty.
n WARNING
Ensure that all safety aspects are checked
before starting the engine.
Starting to Crush Material
3. Measure the crusher discharge opening and
adjust if necessary.
4. Check that all guards are in position and secure.
5. Make sure all personnel are clear of the plant.
n DANGER
Refer to Safety Notices Section for relevant
warning and procedure
FLYING MATERIAL HAZARD
ON MAINTENANCE
PLATFORMS

Table of Contents