EasyManua.ls Logo

PP Systems CIRAS-2 - Page 143

PP Systems CIRAS-2
167 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Diagnostics
CIRAS-2 Operator's Manual Version 2.04
- 141 -
tests are performed where applicable. The user is required to perform certain functions during the
process, such as connecting an external Zero Column (supplied) during the 'Analyser Test' and
connecting a Leaf Cuvette during the 'Leaf Cuvette Tests'. Requires i) external CIRAS-2 Power Supply, ii)
External Zero Column, iii) fresh chemicals, iv) external power supply to Leaf Cuvette (if needed, e.g. for
the PLC5 cuvette or tungsten halogen light source. Approximately 3/4 of an hour required to perform the
tests.
To begin click Start Extended Diagnostics in the first dialog and make the following selections:

Table of Contents

Related product manuals