Bridge Unit (B538)
Accessory Check: Bridge Unit
Check the quantity and condition of the accessories in the box against the following list:
No. Description Q’ty
1. Stepped Screw 2
2. Connector Cover 1
3. Exit Mylar 2
4. Installation Procedure 1
Installation Procedure: Bridge Unit
• Unplug the main machine power cord before starting the following procedure.
1. Unpack the bridge unit and remove all tapes and shipping retainers.
1. Installation
30