5. If the duct on the bottom of the paper output tray base hangs up on the vertical support [E]
below, reach under and pull the duct up over the support.
Bridge Unit Installed
1. Bridge unit [A] ( x 2, x 2)
2. Paper output tray [B] ( x 3)
3. If the duct on the bottom of the paper output tray base hangs up on the vertical support [E]
below, reach under and pull the duct up over the support.
3. Replacement and Adjustment
74