EasyManua.ls Logo

Samsung IWA Series - Preparations before installation

Samsung IWA Series
219 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LED R&D Lab(VD)
35
2. Preparation for Cabinet Installation
Preparations before installation
Remove the Box tape at the upper area and then open up the box. (Fig.2)
Remove the Top-cushion and bag shielding. Grab the handle inside, take out the cabinet and open Al-Bag.
Then remove the filament-tape and PAD-EPE.
Check if the Sliding Bolts are fixed well.
(Fig.3)
Fig.1 Packing
Component
Fig. 2 Opening of Box Fig.3 Check the Bolt
Al-Bag
Open Bag Zipper
SLIDING BOLT
LED set
Box
Top-Cushion
Bottom-Cushion
Accessory

Table of Contents

Related product manuals