⑤ Connect and install the power cable in the same way for the remaining 2,3,4,5,6 CABINETs in the
1st stage
.(Fig.1)
※ In the first stage installation, the even numbered CABINET connects the next CABINET and DATA CABLE first and installs it.(Fig.2)
(However, do not leave it on for more than 10 seconds before dehumidifying)
※ For more information on cable connection, refer to Chapter 9
※ When installing a large screen, refer to a separate guide
Fig.1 POWER CABLE connection
LED
1 2 3 4 5 6
Fig.2 Even numbered CABINET Data CABLE connection
DATA CABLE cabling specification
DATA OUT
DATA IN
23
Fix the DATA CABLE to the frame and shape it.
◇ CABINET installation (IWA P1.26)