EasyManua.ls Logo

Samsung IWA Series - 슬라이드 번호 73

Samsung IWA Series
219 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LED R&D Lab(VD)
72
※ Step 1 If the last CABINET is the even number, connect by installing I/G on the side frame of the last CABINET.(Fig.1).
※ If the last CABINET in the first stage is an odd number, I/G is installed on the side frame of the last CABINET in the top to
connect.(Fig.2)
※ For more information on IG location, refer to Chapter 9 Power and Cable Connection.
1
even
I/G
B/BOX
I/G
Fig.1 I/G placement when the last is an even numbered CABINET Fig.2 I/G placement when the last is an odd-numbered CABINET
1
odd
I/G
B/BOX
I/G
last
CABINET installation (IWA P1.26)
[ UHD SCREEN (36Cabinet) ]
5. Cabinet + Frame installation

Table of Contents

Related product manuals